Sunday, December 14, 2008

Weekend work

After a morning's trip to view granite in Orlando, we returned to the building site to several small jobs. We stained some wood, chain saw milled a few planks of the pine that was lightning struck, burned some brush piles, and attempted hanging an interior door. After lots of tedious leveling, we decided we needed longer nails to secure the frame. We also decided that we have a lot to learn about hanging doors.



We filled some cracks in the "accent wall" that we're painting. It's looking nice.




And the cabinets are almost in. They're carefully connected to the wall, to the floor and to each other, leveled and leveled again, ready for the granite installer to make a template this week.