Rerouting plumbing
A slight change in plans means that plumbing need to be shifted under
the concrete of the outdoor shower. The tile installer masquerades as
a plumber, but he is given away when he uses tiling tools to cut the
PVC.
Newer Post
Older Post
Home
Blog Archive
►
2016
(6)
►
January
(6)
►
2015
(4)
►
November
(2)
►
May
(1)
►
April
(1)
►
2013
(2)
►
September
(2)
►
2012
(5)
►
January
(5)
▼
2011
(77)
►
December
(10)
►
November
(2)
►
October
(9)
►
August
(9)
►
May
(7)
▼
April
(15)
Tiling progress
Tiling begins
Rerouting plumbing
The roof beckons
Granddad Kiker on the job
Remy is back!
Trench diggers
Breakfast theater
Downspouts
Removing screen doors
Seamless Gutters
Air layering
Electricity to the well
Deeper
Well drilling
►
March
(7)
►
February
(4)
►
January
(14)
►
2010
(18)
►
December
(13)
►
February
(5)
►
2009
(105)
►
September
(2)
►
August
(12)
►
June
(16)
►
April
(14)
►
March
(12)
►
February
(26)
►
January
(23)
►
2008
(117)
►
December
(9)
►
November
(14)
►
October
(12)
►
September
(7)
►
August
(19)
►
July
(36)
►
June
(20)
►
2007
(4)
►
October
(4)
Followers