Saturday, September 12, 2009
Bathroom tiling continues
The bathroom floor is going in. Remy installs the drain in the shower floor with his young apprentice at his side. The semi-skilled labour provide some assistance by giving the bathroom a 360 degree cleaning.


Shiplap complete
The shiplap exterior siding on the addition is complete. Here is the south view of the house from the back side.

And the north view as you approach the house. The first phase of building is on the right with the cupola, the porch is in the middle, and the addition is the 1-1/2 story structure on the left.
And the north view as you approach the house. The first phase of building is on the right with the cupola, the porch is in the middle, and the addition is the 1-1/2 story structure on the left.
Saturday, August 22, 2009
"Papa! Papa!"
Views from the play loft
The play loft created by putting a ceiling over the bedrooms in the "first house" provides residence for the air conditioning system, but there remains ample play space for train tracks and legos. Since it is a terminal destination, with no through traffic, fantastic constructions can remain in place for days. Here is a view of boys down below playing Baseball on Mommy's I-Phone.

Another view from the play loft across the cupola to the east gable end. The AC duct cozies up to the south side of the cupola.
Another view from the play loft across the cupola to the east gable end. The AC duct cozies up to the south side of the cupola.
Bushwhacking
Clearing out the storage unit