The bathroom floor is going in. Remy installs the drain in the shower floor with his young apprentice at his side. The semi-skilled labour provide some assistance by giving the bathroom a 360 degree cleaning.
Saturday, September 12, 2009
Shiplap complete
The shiplap exterior siding on the addition is complete. Here is the south view of the house from the back side.
And the north view as you approach the house. The first phase of building is on the right with the cupola, the porch is in the middle, and the addition is the 1-1/2 story structure on the left.
And the north view as you approach the house. The first phase of building is on the right with the cupola, the porch is in the middle, and the addition is the 1-1/2 story structure on the left.
Subscribe to:
Posts (Atom)